Wirral Game Fishing Club

image41

 Oxybox SII 4 diffuser system in 8ft depth 

360W high power single panel

image42

500mm Linear diffusers mounted on anti silt trays

Cadeby Hall Lake Aeration

image43

Project Information

Dual Solar & On Grid power controller


4 off Linear diffusers spanning from island mounted Oxybox 

System installed by SAS Engineers over 1 day

Newbiggin pond - Chapeltown & District AA

image44

Project Information

 Installed setup and commissioned by SAS over 1 day. 

 Oxybox S2 system, 3 panels, 2 pump, with 4 off  1000mm Linear diffusers, providing >14 hours a day operation.

NI Coca Cola Plant – Lagoon Aeration

Project Information

The installation in Northern Ireland Coca Cola plant was for Aeration of waste water lagoons. This was supplied as a pretested kit, installed by Coca Cola, then SAS Engineering did the final commissioning and test.


This environmental project used a 4 pump system and due to the geographical open location,  a 300W Wind Turbine used to complement the solar array..


This allows this system to run 12-14 hours a day.



image45

Suez Waste Plant – Lagoon Aeration

image46

Project Information

An installation in Suez waste plant , Tyne & Wear for run off lagoon water.


Installed and commissioned by SAS, this consisted of twin solar 260W Solar panels and 400W Wind Turbine.


Sankey Angling – Dimmingsdale Wind & Solar

Project Information

This installation was a combination of work by Dimmingsdale members and SAS Engineer. It is a twin Solar box system each Oxybox contains 2 pumps. 


The interesting arrange here is that the 300W Wind Turbine output is shared between the two boxes.



image47

Prince Albert AA – Lake installation

image48

Project Information

Supply and installed in conjunction with club members and Aquaculture Equipment.


A custom Oxybox with 2 pumps, single 300W panel plus 300W Wind Turbine

Portsmouth Angling Society

Project Information

This installation consists of multiple locations and mounting arrangements. With security in mind many of the ponds Oxybox S2 have the benefit of a small Island to locate the systems.


With 4 Oxybox S2 systems installed, these all run 4 diffusers per box and have dual 300W panel arrangements.


The remote control override is of particularly useful due the location of the systems.


image49

Holywell Anglers – Lake installation

Project Information

Supplied as a kit for the club to install, located on the North Wales coast.


This runs a dual 250W solar panel system with custom made ring diffusers and dual linear pumps


Glamorgan Anglers Club - Multiple lakes

Project Information

Installed over multiple site across South Wales. The original systems were installed by SAS and latter ones by the club members


Due to the coastal location, these were all combination of Solar and Wind systems with various diffuser types.  


These have been upgraded over the past years as Solar panel efficiency increased.



image50

Home installation ( France ) - Multiple lakes

Project Information

Supplied as a kit to the customer near Rennes, France


3 panels 4 pump, with 8 off  500mm Linear diffusers, providing >10 hours a day operation.


Home installation (P.Duke) Salisbury- Pond installation

Project Information

 

Supplied as a kit to the customer near Salisbury, UK


Oxybox S2 systems, 2 panels 2 pump, with 4 off  1000mm Linear diffusers, providing >10 hours a day operation.


Solstice Power Solutions – Lake installation

Project Information

 

Supplied as a kit to the customer for client, UK with SAS providing setup and commissioning support.


Oxybox S2 system, 2 panels, 2 pump, with 4 off  1000mm Linear diffusers, providing >10 hours a day operation.


Swallowfield Anglers – Lake installation

Project Information

 

Supplied as a kit to the customer for client, UK with SAS providing setup and commissioning support.


Oxybox S2 system, 2 panels, 2 pump, with 4 off  1000mm Linear diffusers, providing >10 hours a day operation.


image51